





ProjectBenjamin Moore
All ProjectsLocation
Pell City, AL
Owner
Benjamin Moore
Size
128,304 SF
This project consisted of a 128,304 SF warehouse and distribution center, including 5,252 SF of office space and locker rooms. The warehouse and distribution center were constructed of a pre-engineered metal building with a rigid frame and metal wall sheets. The office and locker rooms were built out of CMU and open web steel joist framing. The exterior office walls were constructed of Dri-Design aluminum decorative panels.
Category
Services
Project Images




